StepsStone Prasanas

Since there is a demand for Luxury Homes in South Chennai, Sholinganallur. Stepsstone chose this location, which is the best area for residential use and very closer to IT hubs and SEZ. Another factor in Sholinganallur is the connectivity, a highly appreciating OMR connected to major parts of the city through the Metropolitian Transport Corporation Services. It is well connected to Medavakkam , Velacherry and Sholinganallur . It is one of the fastest developing areas with well equipped socio and civiclinfrastructure, with green and quiet environment. People now a day’s look for their property with good connectivity .

DOWNLOAD E-BROCHURE

75
Flats

2&3
BHK

836 - 1325
sq ft

Sholinganallur

Amenities

Prasanas - Chennai Flats, Apartments in Sholinganallur is cool, comfy and well-equipped for you and your Children.

Air Conditioned Gym

Indoor Games Room

Association Hall

Children's Play Area

Drivers' Restroom

24 Hrs Power Backup

Lift

Landscape Area

STP

Specifications

These are building blocks that craft step-by-step luxury to deliver an ambience where you status is truly updated

Structure

RCC framed structure with block masonry and cement mortar plastering/ gypsum plaster

Flooring

Hall, dining and other bedrooms – 2' x 2' Vitrified tiles; Balcony and utility 1' x 1' Ceramic tiles.

Painting

Internal walls will be finished with Gypsum/putty and tractor emulsion. Enamel paint or doors and grills

Joiners

Main door in teak wood frame with B.S.T finish flush shutters and other doors are with country wood frame with architectural finish skin doors. Toilet – PVC door with frame.

Windows

UPVC Open-able / Sliding windows

Kitchen

Granite cooking platform top with single bowl stainless steel sink wall dado up to 2 height for platfonn area using 10" x 15" tiles.

Toilets

Digital wall tiles up to 7'0" height for walls of size 10" x 15", Anti-skid ceramic tiles for flooring

Sanitary Fittings

IS branded closet, wash basin and CP fittings will be provided.

Electrical

Three phase supply with independent meters. Concealed multi–stranded FRLS copper wiring of IS brand with necessary points like TV, telephone & geyser point with modular type switches and distribution box with MCB.

Water Proofing

Water proofing treatment using brush bond technology will be perfomrmed for all rest rooms, utility and other water storing bodies as per architect design. Anti Termite treatment will be performed in three various stages for each building of the project

Anti Termite

Anti-termite treatment will be perfonned in three various stages during construction of building

Extra Work

As per requirement by client at extra cost, whichever is technically possible.

Location Advantage

Schools

  • PSBB Millennium School
  • BVM Global School
  • Vels Billabong – ECR
  • HLC International – CBSE
  • American Montessori – CBSE
  • Velammal Vishyasharam
  • Bharathi Vidyalaya
  • St.Johns International

Entertainment and Tourism

  • MGM – 8 Kms
  • MAYAJAL – 8 Kms
  • ECR ROAD – 2 KMS
  • AGS CINEMAS – 3KMS
  • VGP

Colleges

  • Sathyabama University
  • Jerusalem Engg. College
  • St.Joseph College Of Engineering
  • Agni Institute Of Engg
  • Balaji Dental College
  • New Prince College Of Engg
  • Sams College Of Engg
  • Mohamed Sathak College Of Engg
  • Regus Dental College
  • T.J Institute – Karapakkam
  • Sri Venkateswara Engg.College – Navalur
  • KCG College Of Tech – Karapakkam
  • SK Forma
  • Vels University

Hospitals

  • Global Hospital
  • Life Line Hospital
  • Chettinad Hospital

Railways

  • Tambaram
  • Velachery
  • Metro Phase II

Corporates

  • Siruseri
  • Elcot
  • Perungudi

Payment Schedule


On Booking
Rs. 1,00,000/-

  • On Sale Agreement 20%
  • Within 30 days from the date of booking 35%
  • On completion of Slit floor roof 7%
  • On completion of First floor roof 7%
  • On completion of Second floor roof 7%
  • On completion of Third floor roof 7%
  • On completion of Fourth floor roof 7%
  • On completion of block work 4%
  • On completion of Plumbing, Woodworks 3%
  • On handling over possession 3%